Field guides for people
who carry the risk.
Written from twenty years of close-outs, one for each seat at the table. Free, practical, and short enough to read before your next delivery meeting. Pick yours below.
Protecting Settlement
The three ways close-out costs a developer, what to demand from month one, and the five questions that surface trouble early.
The Clean Exit
Off the job with nothing carried: register discipline that protects your margin, the last 12 weeks run properly, and why independent verification releases retention.
The DLP, Used Properly
The twelve-month battle rhythm, the defects that hide until month ten, and the NSW warranty deadlines every owners corporation should have diarised.
The PC-Readiness Checklist
The 40-point checklist Group 4 walks before calling a project ready — with a scoring method so readiness gets a number, not a feeling.
Tell us where to send it.
Requesting: your guide
Why these are free. Each one is a working extract of how Group 4 actually runs an engagement. If they save your project a bad week, you'll remember where they came from. If they surface a problem you can't fix internally — that's the conversation.
Want the deeper reading? The Guides library covers defect registers, practical completion and handover assurance in full — no email required.